Just a few 'quirks'...

Q1:
In the actions list, the sorting seems to be a bit strange. If I sort on a date column, the actions are sorted correctly, but the actions with a date set are placed below the ones without an entry in that field. That is, the DoASAP entries are listed before the ones with a date set. I would prefer to have the scheduled entries (presumably the ones that are most important to keep in plain view) at the top and the DoASAPs below. Is there a way to fix this?

Q2:
Is the default sorting of the list the same as when clicking on the header of the 'done tickbox' column? If not: How do I restore the default sorting after clicking on a column header? :?

Q3:
I understand that some sorting options will be available in the final release. Will that include sorting on dates regardless of which date is set? Due date and action date (and maybe start date) would be the likely useful candidates here.

To clarify what I mean, say you have two entries with action dates 10. and 12. and one entry with due date 11. The sort sequence would be first action date, due date, second action date. (Q1 is relevant here too.)

Reasoning: Due date and action date have a very similar meaning, but are used for different kind of entries. Scheduled and deferred actions use action date, projects and DoASAPs use due date. Sometimes it would be natural to have them intermixed.

...in my mind at least. ;)

Frode


Top
 Profile  
 
PostPosted: Sun Nov 18, 2007 10:08 pm 
Offline

Joined: Thu Nov 15, 2007 12:46 pm
Posts: 13
fropeter wrote:
Q3:
Reasoning: Due date and action date have a very similar meaning, but are used for different kind of entries. Scheduled and deferred actions use action date, projects and DoASAPs use due date. Sometimes it would be natural to have them intermixed.


Just thinking a bit further... :)
Would it be possible to have a single date field covering both uses? If I've got it right, the two fields are never used simultaneously for an action/project. If so, it would be a matter of finding a common name for these two uses that would sound natural. (Apart from the change in code that I don't know the extent of.)

Maybe the change would only entail having an extra virtual report column or criteria for sorting/filtering in the reports.

I don't want to jump the gun here, but if this sounds like somthing to implement, would it be in 2.0 or later? I suppose there must be a feature freeze at some time?

Regards, Frode


Top
 Profile  
 
 Post subject:
PostPosted: Wed Nov 21, 2007 12:40 am 
Offline

Joined: Tue Nov 20, 2007 11:42 pm
Posts: 4
Location: Sydney
Err... me too. ;)

This is issue 3 that I've come across while trying to learn TR. I think Frode has hit in on the head with his thinking of sorting via the dates... at least I think exactly the same way he does! ;)

I think the biggest issue in what he notes is the sorting of date fields; to me/us it's sort of backwards. While I was trying to nut how to use it (I figured maybe I was just doing something wrong), it occurred to me that the problem could be fixed by not treating empty date fields as automatically lower than every other date. e.g. in the sorting, if an action doesn't have a date set, assume it has a date of like Jan 1, 9999 and therefore they will always drop to the *bottom* of the list instead of the top like they do now when doing an ascending date sort.


Top
 Profile  
 
 Post subject:
PostPosted: Wed Nov 21, 2007 9:04 am 
Offline

Joined: Sat Nov 03, 2007 2:27 pm
Posts: 49
I think that these are good suggestions. Especially the non-precedence of the empty date fields.


Top
 Profile  
 
PostPosted: Thu Nov 22, 2007 7:47 pm 
Offline

Joined: Thu Nov 15, 2007 12:46 pm
Posts: 13
Good to know that it's not just me.. ;)

fropeter wrote:
Would it be possible to have a single date field covering both uses? If I've got it right, the two fields are never used simultaneously for an action/project. If so, it would be a matter of finding a common name for these two uses that would sound natural. (Apart from the change in code that I don't know the extent of.)

Maybe the change would only entail having an extra virtual report column or criteria for sorting/filtering in the reports.


If I could use this instead of the 'due date' and 'action date' columns, it would really help with my cramped laptop screen. Sometimes it's difficult to get column widths that are good to view quickly.

Frode

PS
Should this thread be moved to the 'Suggestions' list?


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 5 posts ] 

All times are UTC


Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group